An entire restoration project for a waterfront property. This included installing 150 meters of shoreline restoration, using the Lake Simcoe Conservation Authorities, natural boulder, and local planting system. Along with a cedar shake shed. Whether along the Black River, the Maskinonge River, or any river!, we can help.

Waterfront Restoration
Date

June 1, 2016

Category

SHORELINE RESTORATION